OHE & S&T SystemsOHE & S&T — Adani Logistics Siding, Virochan Nagar
Adani Logistics Ltd
Overhead electrification over 5.6 km (₹7.5 Cr) and complete signalling & telecommunication systems (₹12 Cr) — successfully commissioned.
OHE & S&T SystemsOngoingOHE & S&T — NTPC Ramagundam TPS
Tata Projects Ltd & NTPC
Complete overhead electrification over 21 km (₹16 Cr) and full signalling & telecommunication systems (₹14 Cr) for the Ramagundam railway siding.
Ballastless / Metro TrackOngoingMMRDA Line-4 & 4A — Mumbai
Mumbai Metropolitan Region Development Authority
Ballastless trackwork on the mainline from Mulund Fire Station to Gaimukh, including Gaimukh station siding tracks and depot approach.
Railway SidingOngoingNTPC Ramagundam Railway Siding
Tata Projects Ltd & NTPC
Turnkey execution of a complete railway siding — earthwork, track linking, bridges, service building, loco shed, S&T and OHE for NTPC’s Ramagundam thermal power station.
BuildingIRWO Housing — Zirakpur
Indian Railway Welfare Organisation
331 dwelling units (Type-II to Type-IV, G+2S to G+7), 44 EWS units (G+3) and a community centre — RCC frame structures.
Ballastless / Metro TrackMaha Metro Pune — Reach-1
Maharashtra Metro Rail Corporation
Design, supply, installation, testing and commissioning — SG ballasted track at Range Hill Depot and ballastless track on the elevated PCMC corridor.
Ballastless / Metro TrackChennai Metro Phase-1 Extension
Chennai Metro Rail Ltd
Installation, testing and commissioning of standard-gauge ballastless track across elevated and underground sections, plus the Wimco Nagar depot.
Ballastless / Metro TrackNavi Mumbai Metro — Belapur–Pendhar
Tata Projects Ltd
Ballastless track work for Navi Mumbai Metro Line-1 — about 23 km across the elevated corridor and Taloja depot.
Ballastless / Metro TrackMaha Metro Pune — Reach-2
Maharashtra Metro Rail Corporation
Standard-gauge ballastless track for the elevated Vanaz–Civil Court corridor — 6.8 km.
Railway SidingAdani Logistics Railway Siding — Virochan Nagar
Adani Logistics Ltd
5.4 km of track linking with comprehensive supply of rails, sleepers, turnouts and fittings, plus complete installation and commissioning of S&T and OHE systems.
Ballastless / Metro TrackOngoingMaha Metro Pune — Reach-1 Extension
Maharashtra Metro Rail Corporation
SG ballastless track for the elevated PCMC–Nigdi section — supply of 1080-grade HH rails, fastenings and 1-in-9 R300 ballastless turnouts, with installation, testing and commissioning.
Bridge & RoadNTPC Ramagundam Bridges
Tata Projects Ltd
RCC twin-box bridge, PSC slab and RUB bridges as part of the 23 km siding works, including buildings, FOB, S&T and OHE.
Bridge & RoadMCD Drain Covering — Delhi
Municipal Corporation of Delhi
Covering of the GK-I Nallah — RCC boxes of 13.4 m × 3.4 m over a 1,050 m length, with approximately 17,000 cum of RCC.
Ballastless / Metro TrackDMRC — Indraprastha to Noida City Centre
DMRC / KRNEL
Laying of 28 km of ballastless track with expansion joints on one of DMRC’s busiest corridors.
Railway SidingJharli Railway Siding — Jhajjar TPS
NTPC / RITES / KRNEL
Railway track for coal transportation to the Jhajjar thermal power plant — 16.2 km of track laying with allied works.
Railway SidingOngoingKazipet Junction Station Yard Remodelling
South Central Railway (Dy. CE/C/KZJ)
Yard remodelling works at Kazipet Junction for South Central Railway.
BuildingNIT Building — Kurukshetra
NIT Kurukshetra
Multi-storied staff housing — 20 Professor and 20 Assistant Professor units — RCC frame structures on the NIT Kurukshetra campus.
Alpha Terminals Logistics Park — Lonavala
Alpha Terminals
Logistics park development — civil, P-way and allied infrastructure.
Hind Terminals — Jaipur Goods Sheds
Hind Terminals Pvt Ltd
Development of goods sheds — all civil and P-way works.
Bridge & RoadH.L. Bridge — Jhansa
PWD B&R Haryana
High-level bridge with well foundations on the Markanda River (7 spans of 23.5 m) and a box-type bridge on the SYL Canal (5 spans of 7.0 m).
Ballastless / Metro TrackDMRC — Inderlok / Kirti Nagar to Mundka
DMRC / INDU
19.68 km of ballastless track and 32 turnouts — the first standard-gauge ballastless turnouts laid in India.
IPRCL Terminal Track Works
RITES Ltd / IPRCL
Earthwork in formation, track linking and allied works for Indian Port Rail Corporation.
Hind Terminals GCT — Dalpatpur, Moradabad
Hind Terminals Pvt Ltd
Development of a Gati Shakti cargo terminal — all civil and P-way works.
Chennai Port Trust — Cargo Platform
Chennai Port Trust
Cargo-handling platform with 900 m of track linking and earthwork.
Ballastless / Metro TrackDMRC — Mundka & Dwarka Extensions (Lines 3 & 5)
DMRC / Larsen & Toubro
Ballastless track installation across roughly 28 km of DMRC Phase-III extensions.
Emirates Logistics DFCCIL Terminal — Surat
Emirates Logistics India
Civil and P-way works at the New Gothangam GCT terminal on the dedicated freight corridor.
Kanpur Metro — IIT to Motijheel
UPMRC / Larsen & Toubro
Ballastless track work for the priority corridor of the Kanpur Metro.
Amtek Railway Siding
Amtek Rail Car Industries
Construction of a 2 km private railway siding including covered loading facilities.
Ballastless / Metro TrackDMRC — Central Secretariat to Badarpur
DMRC / INDU
Track work on the Central Secretariat–Badarpur corridor — about 16 km of ballastless track.
Maha Metro Nagpur — T-05
MMRCL / Rahee Infratech
Ballastless track works on the Nagpur Metro T-05 contract — about 8 km.
CPCL Refinery Track Works — Chennai
RITES Ltd / CPCL
Earthwork in formation, supply of permanent-way materials and 2.86 km of ballasted track.
Kamarajar Port — BG Track Linking
RITES / Kamarajar Port Ltd
Linking of 15 km of broad-gauge track including supply of P-way fittings.
DMRC — IP Extension to Mayur Vihar
DMRC / Alstom Transport India
Installation of ballastless track including PUR Pad MSS floating-slab technology — 6.5 km.
Kribhco Infrastructure Track Works
Kribhco Infrastructure Ltd
Track linking and supply of track materials — 3.12 km of siding works.
RITES — Ballastless Track Works
RITES Ltd
Construction of 1.29 km of ballastless track for RITES.