
10 June 2023
AIPL wins the track-work contract for Mumbai Metro Line-4 & 4A
MMRDA appointed Apurvakriti Infrastructure for ballastless track work on the Wadala–Kasarvadavali–Gaimukh corridor (CA-161) — mainline trackwork from Mulund Fire Station to Gaimukh, plus the Gaimukh station siding and depot approach.