Ballastless / Metro Track · Chennai Metro Rail Ltd
Chennai Metro Phase-1 Extension
Project Overview
AIPL successfully executed the installation, testing and commissioning of Standard Gauge Ballastless Track for the Chennai Metro Phase-1 Extension, covering elevated and underground sections as well as the Wimco Nagar Depot — including supply and installation of turnouts and complete track fittings across roughly 18 km.
Scope of Work
- 0118 km of standard-gauge ballastless track
- 02Elevated and underground (tunnel) sections
- 03Wimco Nagar depot track and turnouts
- 04Testing and commissioning
SITE GALLERY
From the Ground


MORE IN THIS CATEGORY
More Ballastless / Metro Track Work
Ballastless / Metro TrackOngoingMMRDA Line-4 & 4A — Mumbai
Mumbai Metropolitan Region Development Authority
Ballastless trackwork on the mainline from Mulund Fire Station to Gaimukh, including Gaimukh station siding tracks and depot approach.
Ballastless / Metro TrackMaha Metro Pune — Reach-1
Maharashtra Metro Rail Corporation
Design, supply, installation, testing and commissioning — SG ballasted track at Range Hill Depot and ballastless track on the elevated PCMC corridor.
Ballastless / Metro TrackNavi Mumbai Metro — Belapur–Pendhar
Tata Projects Ltd
Ballastless track work for Navi Mumbai Metro Line-1 — about 23 km across the elevated corridor and Taloja depot.
Have a similar project in mind?
Talk to the team that has delivered work like this across India for 18 years.