Ballastless / Metro Track · Mumbai Metropolitan Region Development Authority
MMRDA Line-4 & 4A — Mumbai
Project Overview
AIPL’s largest metro contract to date: ballastless trackwork in the mainline from Mulund Fire Station to Gaimukh on the Wadala–Kasarvadavali–Gaimukh corridor, including Gaimukh station siding tracks and the depot approach. The project is awaiting commissioning.
SITE GALLERY
From the Ground


MORE IN THIS CATEGORY
More Ballastless / Metro Track Work
Ballastless / Metro TrackMaha Metro Pune — Reach-1
Maharashtra Metro Rail Corporation
Design, supply, installation, testing and commissioning — SG ballasted track at Range Hill Depot and ballastless track on the elevated PCMC corridor.
Ballastless / Metro TrackChennai Metro Phase-1 Extension
Chennai Metro Rail Ltd
Installation, testing and commissioning of standard-gauge ballastless track across elevated and underground sections, plus the Wimco Nagar depot.
Ballastless / Metro TrackNavi Mumbai Metro — Belapur–Pendhar
Tata Projects Ltd
Ballastless track work for Navi Mumbai Metro Line-1 — about 23 km across the elevated corridor and Taloja depot.