Project Overview
Executed for M/s Maha Metro in Pune, this project involved the design, supply, installation, testing and commissioning of critical rail infrastructure — Standard Gauge Ballasted Track at the Range Hill Depot and Ballastless Track for the elevated corridor, approximately 13.6 km in total.
Scope of Work
- 0113.6 km — elevated ballastless + depot ballasted track
- 02Design, supply, installation, testing & commissioning
- 03Range Hill depot track works
SITE GALLERY
From the Ground


MORE IN THIS CATEGORY
More Ballastless / Metro Track Work
Ballastless / Metro TrackOngoingMMRDA Line-4 & 4A — Mumbai
Mumbai Metropolitan Region Development Authority
Ballastless trackwork on the mainline from Mulund Fire Station to Gaimukh, including Gaimukh station siding tracks and depot approach.
Ballastless / Metro TrackChennai Metro Phase-1 Extension
Chennai Metro Rail Ltd
Installation, testing and commissioning of standard-gauge ballastless track across elevated and underground sections, plus the Wimco Nagar depot.
Ballastless / Metro TrackNavi Mumbai Metro — Belapur–Pendhar
Tata Projects Ltd
Ballastless track work for Navi Mumbai Metro Line-1 — about 23 km across the elevated corridor and Taloja depot.
Have a similar project in mind?