OHE & S&T SystemsOHE & S&T — Adani Logistics Siding, Virochan Nagar
Adani Logistics Ltd
Overhead electrification over 5.6 km (₹7.5 Cr) and complete signalling & telecommunication systems (₹12 Cr) — successfully commissioned.
BuildingIRWO Housing — Zirakpur
Indian Railway Welfare Organisation
331 dwelling units (Type-II to Type-IV, G+2S to G+7), 44 EWS units (G+3) and a community centre — RCC frame structures.
Ballastless / Metro TrackMaha Metro Pune — Reach-1
Maharashtra Metro Rail Corporation
Design, supply, installation, testing and commissioning — SG ballasted track at Range Hill Depot and ballastless track on the elevated PCMC corridor.
Ballastless / Metro TrackChennai Metro Phase-1 Extension
Chennai Metro Rail Ltd
Installation, testing and commissioning of standard-gauge ballastless track across elevated and underground sections, plus the Wimco Nagar depot.
Ballastless / Metro TrackNavi Mumbai Metro — Belapur–Pendhar
Tata Projects Ltd
Ballastless track work for Navi Mumbai Metro Line-1 — about 23 km across the elevated corridor and Taloja depot.
Ballastless / Metro TrackMaha Metro Pune — Reach-2
Maharashtra Metro Rail Corporation
Standard-gauge ballastless track for the elevated Vanaz–Civil Court corridor — 6.8 km.
Railway SidingAdani Logistics Railway Siding — Virochan Nagar
Adani Logistics Ltd
5.4 km of track linking with comprehensive supply of rails, sleepers, turnouts and fittings, plus complete installation and commissioning of S&T and OHE systems.
Bridge & RoadNTPC Ramagundam Bridges
Tata Projects Ltd
RCC twin-box bridge, PSC slab and RUB bridges as part of the 23 km siding works, including buildings, FOB, S&T and OHE.
Bridge & RoadMCD Drain Covering — Delhi
Municipal Corporation of Delhi
Covering of the GK-I Nallah — RCC boxes of 13.4 m × 3.4 m over a 1,050 m length, with approximately 17,000 cum of RCC.
Ballastless / Metro TrackDMRC — Indraprastha to Noida City Centre
DMRC / KRNEL
Laying of 28 km of ballastless track with expansion joints on one of DMRC’s busiest corridors.
Railway SidingJharli Railway Siding — Jhajjar TPS
NTPC / RITES / KRNEL
Railway track for coal transportation to the Jhajjar thermal power plant — 16.2 km of track laying with allied works.
BuildingNIT Building — Kurukshetra
NIT Kurukshetra
Multi-storied staff housing — 20 Professor and 20 Assistant Professor units — RCC frame structures on the NIT Kurukshetra campus.
Alpha Terminals Logistics Park — Lonavala
Alpha Terminals
Logistics park development — civil, P-way and allied infrastructure.
Hind Terminals — Jaipur Goods Sheds
Hind Terminals Pvt Ltd
Development of goods sheds — all civil and P-way works.
Bridge & RoadH.L. Bridge — Jhansa
PWD B&R Haryana
High-level bridge with well foundations on the Markanda River (7 spans of 23.5 m) and a box-type bridge on the SYL Canal (5 spans of 7.0 m).
Ballastless / Metro TrackDMRC — Inderlok / Kirti Nagar to Mundka
DMRC / INDU
19.68 km of ballastless track and 32 turnouts — the first standard-gauge ballastless turnouts laid in India.
IPRCL Terminal Track Works
RITES Ltd / IPRCL
Earthwork in formation, track linking and allied works for Indian Port Rail Corporation.
Chennai Port Trust — Cargo Platform
Chennai Port Trust
Cargo-handling platform with 900 m of track linking and earthwork.
Ballastless / Metro TrackDMRC — Mundka & Dwarka Extensions (Lines 3 & 5)
DMRC / Larsen & Toubro
Ballastless track installation across roughly 28 km of DMRC Phase-III extensions.
Emirates Logistics DFCCIL Terminal — Surat
Emirates Logistics India
Civil and P-way works at the New Gothangam GCT terminal on the dedicated freight corridor.
Kanpur Metro — IIT to Motijheel
UPMRC / Larsen & Toubro
Ballastless track work for the priority corridor of the Kanpur Metro.
Amtek Railway Siding
Amtek Rail Car Industries
Construction of a 2 km private railway siding including covered loading facilities.
Ballastless / Metro TrackDMRC — Central Secretariat to Badarpur
DMRC / INDU
Track work on the Central Secretariat–Badarpur corridor — about 16 km of ballastless track.
Maha Metro Nagpur — T-05
MMRCL / Rahee Infratech
Ballastless track works on the Nagpur Metro T-05 contract — about 8 km.
CPCL Refinery Track Works — Chennai
RITES Ltd / CPCL
Earthwork in formation, supply of permanent-way materials and 2.86 km of ballasted track.
Kamarajar Port — BG Track Linking
RITES / Kamarajar Port Ltd
Linking of 15 km of broad-gauge track including supply of P-way fittings.
DMRC — IP Extension to Mayur Vihar
DMRC / Alstom Transport India
Installation of ballastless track including PUR Pad MSS floating-slab technology — 6.5 km.
Kribhco Infrastructure Track Works
Kribhco Infrastructure Ltd
Track linking and supply of track materials — 3.12 km of siding works.
RITES — Ballastless Track Works
RITES Ltd
Construction of 1.29 km of ballastless track for RITES.